Archerfield Airport Corporation commends the professional management of Aviation Projects which has driven this project and ensured we continue to make steady, but substantial progress towards achieving our strategic goals. Thanks to this shared commitment, we look forward to an exciting new chapter of growth at Archerfield Airport.
Aviation Projects assisted the team responsible for designing and constructing Carrapateena Aerodrome (YCPT) to secure an Aerodrome Certificate by providing the following services:
- Conducted a preliminary obstacle limitation surfaces survey to validate the obstacle environment and inform the runway geometric design
- Prepared an Application for an Aerodrome Certificate on behalf of the aerodrome operator
- Prepared an Aerodrome Manual and coordinated the development of associated information for submission to CASA
- Conducted a final obstacle limitation surfaces survey and prepared runway declared distances and obstacle gradient data
- Prepared aeronautical information for AIP in the form of the aeronautical data product specification under CASR Part 175
- Conducted an aerodrome safety inspection to enable operation as a 'certain other aerodrome' under CASR Part 139.335 during the aerodrome certification process